£400,000
Land for sale603 London Road, Derby, Derbyshire DE24
Just added
About this property
Approx 6,479 sq ft (601 sq m)
Planning secured for residential property in multiple occupation with 20 Rooms
Conversion works advanced including first fix elecs/plumbing
Being sold at auction Thurs 25th September via sdl Property Auctions
The property, originally the Portland Hotel and public house, is a substantial building on a corner plot and is of three storey traditional brick construction with attractive exterior with feature brickwork and mouldings. There are wooden casement windows with original stain glass detailing on the first floor windows.
The building has secured planning for change of use from Retail with Flats into four flats in multiple occupation providing a total of 20 rooms.
The rooms essentially provide studio style accommodation, each of which have an en-suite shower room with wash hand basin and w.c.
Substantial works have already been completed to form the partitions for the individual rooms with plaster and painted finishes and the first fix for electrics and plumbing are also completed. Some of the en-suites have tile works and fixtures installed.
The plans show for four separate communal kitchen and lounge areas.
There is a small part single and part two storey outbuilding to the rear with planning for shared workspace, gym and sauna although none of these works have been commenced. This building has had some fire damage.
Externally there is an enclosed courtyard with plans providing for cycle rack storage although could potentially provide some parking.
Full plans and details available on request
The building has secured planning for change of use from Retail with Flats into four flats in multiple occupation providing a total of 20 rooms.
The rooms essentially provide studio style accommodation, each of which have an en-suite shower room with wash hand basin and w.c.
Substantial works have already been completed to form the partitions for the individual rooms with plaster and painted finishes and the first fix for electrics and plumbing are also completed. Some of the en-suites have tile works and fixtures installed.
The plans show for four separate communal kitchen and lounge areas.
There is a small part single and part two storey outbuilding to the rear with planning for shared workspace, gym and sauna although none of these works have been commenced. This building has had some fire damage.
Externally there is an enclosed courtyard with plans providing for cycle rack storage although could potentially provide some parking.
Full plans and details available on request