Non quoting
Industrial for saleFairburn Way, Pickering YO18
From 1,229 - 14,700 sq. ft
Just added
About this property
New build industrial units - for sale / to let
Currently being constructed, due to be completed by June 2026
1 mile from Pickering Town Centre
5m Eaves Height
Vibrant Business Community
Level Access Loading Doors
Cycle Storage / Disabled Parking
Location
Located just off the A170 between Thirsk and Scarborough, this site is only 1 mile from the centre of Pickering and 8.8 miles from Malton Train Station. There is a Bus Stop 1 minute away with services every 40 minutes, ensuring excellent connectivity to the site.
Specification
The units will benefit from the following:
• Steel portal frame construction
• Ground level loading / roller shutter doors.
• Eaves heights of 5m to a pitch of 6m.
• Kitchenette and WC
• Solar pv on the roof - reducing electric bills
EPC Rating
The units will benefit from an EPC A rating or better.
Located just off the A170 between Thirsk and Scarborough, this site is only 1 mile from the centre of Pickering and 8.8 miles from Malton Train Station. There is a Bus Stop 1 minute away with services every 40 minutes, ensuring excellent connectivity to the site.
Specification
The units will benefit from the following:
• Steel portal frame construction
• Ground level loading / roller shutter doors.
• Eaves heights of 5m to a pitch of 6m.
• Kitchenette and WC
• Solar pv on the roof - reducing electric bills
EPC Rating
The units will benefit from an EPC A rating or better.



.png)