£4,760,392
(€566/sq. ft)
€5,500,000
5 bed villa for saleCala Vinyes, Mallorca, Balearic Islands
5 beds
5 baths
9,720 sq. ft
About this property
Fireplace
Garden
New Build
Solar Panels
Underfloor Heating
Garage
Air Conditioning
Sauna
Unique investment opportunity:
This sensational project involves the construction of a luxury villa near the fine sandy beach of Cala Vinyes.
The 903 m2 of built area will include: 5 bedrooms with en suite bathrooms, a living and dining area and a fully equipped kitchen.
Thanks to the latest building technology, such as solar energy, a decalcification system and an osmosis system, energy-efficient and future-oriented living is possible here.
Floor-to-ceiling windows and high ceilings fill the rooms with plenty of natural light and create a friendly atmosphere.
The high-quality furnishings ensure a high level of comfort: Underfloor heating, air conditioning, fireplace, wine cellar, fitness room, sauna and much more.
The outdoor area impresses with a large pool with Jacuzzi, surrounded by sun terraces and a lovingly designed garden.
The garage has charging stations for electric cars and space for three cars.
Completion is scheduled for November 2025.
This sensational project involves the construction of a luxury villa near the fine sandy beach of Cala Vinyes.
The 903 m2 of built area will include: 5 bedrooms with en suite bathrooms, a living and dining area and a fully equipped kitchen.
Thanks to the latest building technology, such as solar energy, a decalcification system and an osmosis system, energy-efficient and future-oriented living is possible here.
Floor-to-ceiling windows and high ceilings fill the rooms with plenty of natural light and create a friendly atmosphere.
The high-quality furnishings ensure a high level of comfort: Underfloor heating, air conditioning, fireplace, wine cellar, fitness room, sauna and much more.
The outdoor area impresses with a large pool with Jacuzzi, surrounded by sun terraces and a lovingly designed garden.
The garage has charging stations for electric cars and space for three cars.
Completion is scheduled for November 2025.