Non quoting
Industrial to letEurocentral, Motherwell ML1
From 42,500 - 122,500 sq. ft
Unfurnished
About this property
Minimum 10m clear internal eaves height
Dock level loading doors and At-grade level access doors
45m deep secure external concrete service yard
Perimeter security fencing to yard areas and 24/7 access
12% rooflights to warehouse area
50 k/Nm2 floor load (FM2)
Minimum 5% office / welfare space at first floor
Generous dedicated car parking including evc spaces
Security provision including CCTV
The subjects comprise a 40 acre development site with scope to construct up to 353,000 sq ft of new industrial/logistics accommodation.
Planning approved for 5 buildings, see attached masterplan which shows:
Unit 1A: 122,500 sq ft
Unit 1B: 55,500 sq ft
Unit 2: 75,000 sq ft
Unit 3: 57,500 sq ft
Unit 4: 42,500 sq ft
Masterplan layout supersedes the attached brochure.
Planning for Class 5 (general industrial) and Class 6 (storage and distribution).
Eurocentral is the premier distribution hub for central Scotland located 11 miles to the east of Glasgow and 31 miles west of Edinburgh.
It has a dedicated interchange (Junction 7) of the M8 motorway, the main central motorway linking east to west and lies 4 miles east of the Baillieston Interchange, linking the M8, M74(M6) and M73 motorways.
Eurocentral is also 4 miles from the Raith Interchange (J5 M74) via the A725 providing unrivalled connectivity to the M6 and the South.
Glasgow and Edinburgh International Airports are within 30 minutes of the development with Prestwick air freight terminal within an hour’s drive.
Eurocentral is a well-established logistic hub with on-site rail freight terminal operated by db Schenker.
Occupiers within the estate include dhl, xpo Logistics, Sheffield Insulation Group, Amazon, News International, Wincanton and Scottish and Southern Energy, dpd and nhs.
Lidl have completed the construction of a new 625,000 sq ft Scottish distribution centre.
Planning approved for 5 buildings, see attached masterplan which shows:
Unit 1A: 122,500 sq ft
Unit 1B: 55,500 sq ft
Unit 2: 75,000 sq ft
Unit 3: 57,500 sq ft
Unit 4: 42,500 sq ft
Masterplan layout supersedes the attached brochure.
Planning for Class 5 (general industrial) and Class 6 (storage and distribution).
Eurocentral is the premier distribution hub for central Scotland located 11 miles to the east of Glasgow and 31 miles west of Edinburgh.
It has a dedicated interchange (Junction 7) of the M8 motorway, the main central motorway linking east to west and lies 4 miles east of the Baillieston Interchange, linking the M8, M74(M6) and M73 motorways.
Eurocentral is also 4 miles from the Raith Interchange (J5 M74) via the A725 providing unrivalled connectivity to the M6 and the South.
Glasgow and Edinburgh International Airports are within 30 minutes of the development with Prestwick air freight terminal within an hour’s drive.
Eurocentral is a well-established logistic hub with on-site rail freight terminal operated by db Schenker.
Occupiers within the estate include dhl, xpo Logistics, Sheffield Insulation Group, Amazon, News International, Wincanton and Scottish and Southern Energy, dpd and nhs.
Lidl have completed the construction of a new 625,000 sq ft Scottish distribution centre.


.png)