Non quoting
Industrial to letSustainability Way, Leyland PR26
From 28,000 - 36,000 sq. ft
Available immediately
Freehold
About this property
EPC A Rating
10% roof lights
FM2 Slab
Pv Ready Roof
BREEAM Excellent
10% EV Charging Points
7 acre ecological area
Showers/Drying Rooms
Property Description
Farington Park Phase 2 will comprise of 4 high quality new build units ranging from 28,000 sqft to 33,000 sqft. Units are availble To Let / For Sale.
Unit 2 - 28,000 sqft (2,601 sq m)
Unit 3 - 14,750 sqft (1,370 sq m)
Unit 4 - 20,000 sqft (1,858 sq m)
Unit 5 - 33,000 sqft (3,065 sq m)
Location
Farington Park Phase 2 is located on Sustainability Way, which lies just off Centrurion Way. Centurion Way in turn provides direct access to to the A6 and onto both J1 of the M65 and J29 of the M6.
Manchester City Centre lies approximately 30 miles south from the scheme whilst Liverpool is 35 miles south west.
Farington Park Phase 2 will comprise of 4 high quality new build units ranging from 28,000 sqft to 33,000 sqft. Units are availble To Let / For Sale.
Unit 2 - 28,000 sqft (2,601 sq m)
Unit 3 - 14,750 sqft (1,370 sq m)
Unit 4 - 20,000 sqft (1,858 sq m)
Unit 5 - 33,000 sqft (3,065 sq m)
Location
Farington Park Phase 2 is located on Sustainability Way, which lies just off Centrurion Way. Centurion Way in turn provides direct access to to the A6 and onto both J1 of the M65 and J29 of the M6.
Manchester City Centre lies approximately 30 miles south from the scheme whilst Liverpool is 35 miles south west.